Last minute overnight guests? No problem. This Kozy single folding bed with mattress is so easy to move and gives you a restful sleep, wherever it stays. The metal frame is strong, with the three long legs giving balance. This fold out bed comes with a top mattress - 8cm thick and soft, it will keep you comfortable with just the right amount of support. Eight wheels on the base mean you can move it around easily from room to room. It's complete with two handrails and two side pockets.
Features:
- Great for all homes - bringing out a spare bed for overnight guests
- Five-level adjustable headrest - support your upper body area up, or lie down completely
- Foldable design makes it easy to store, with eight wheels to move around easily. Four are lockable
- Thick padded mattress for a comfortable sleeping experience
- Metal frame is strong and fully supportive
- Two handy side pockets
- Two side rails to get up and into the bed easily
- Maximum load 150kg, assembly required
Specification:
- Color: White Mattress, Brown Frame
- Material: Steel, Sponge, Fabric (100% Polyester)
- Overall Dimension: 190L x 76W x 33Hcm
- Folding Dimension: 76W x 36D x 104Hcm
- Handrail Length: 49cm
- Handrail Height: 20cm
- Storage Bag Size: 25W x 19Hcm
- Mattress Thickness: 8cm
- Weight Capacity: 150kg
- Item Label: 831-518V70
Package Includes:
- 1 x Folding Bed
- 1 x Manual